ARE-Energy Patent Pending Containerize Packaging Tri-Set reduces the three main components of cost, shipping, site building, and time, with our Container Housing Tri Set
|
|
|
| |
|
|
| |
 |
| |
Our Patented Pending Packaging sizes each module as a high-cube 20’0 x 8’0 x 9’6’ Intermodal Container that facilitates easy shipment anywhere in the world. |
|
| |
|
| |
 |
|
| |
All that is needed at the Job site—with your fuel choice---is a 70’ x 12’ concrete slab designed to local soil conditions |
|
| |
|
| |
When the units arrive at t he job site they are linked together to form a single unit. |
| |
|
|
| |
 |
|
|
 |
|
| |
|
| |
The fabricated heavy beam engine skid frame also severs as the structure floor frame for the container |
|
. . |
The corners are securely tied together with patented bolted connectors
|
|
| |
|
|
| |
 |
| |
Truly a simple total system that reduces transportation, housing, and installation cost. |